Every upload in CupixConnect asks where the data belongs before it sends anything. This article explains those fields, and how they differ between 5.0 projects and projects shared with CupixWorks 4.0.
The fields
| Field | What you choose |
|---|---|
| Area Name | Free text, pre-filled with a time such as Area [13:30:59]. You can replace it. |
| Workspace and Project | Where the data goes. In a workspace shared with CupixWorks 4.0, projects made in 5.0 carry a v5 only badge; point at it to see Created in CupixWorks v5. Not visible in v4. |
| Site / building | 5.0 projects only. See below. |
| Capture | An existing capture date, or Create New Capture to start a new one. |
| Level | An existing level, or Create New Level. Not shown when you choose a site. |
Site or building
A 5.0 project can hold sites and buildings. The Site / building list shows them in two groups, SITES and BUILDINGS, and the first building is chosen by default.
| You choose | What happens |
|---|---|
| A building | The Level list shows that building's levels, and a new level is created in that building. |
| A site | There is no level to choose. The upload is saved to the site's ground level. |
So a scan of the second floor goes to the building and then to its 2F; data for the outdoor ground goes to the site. Choosing wrongly does not fail the upload, but files the data where your team will not look for it.
Projects shared with CupixWorks 4.0
A project shared with 4.0 has no Site / building field. The Level list shows the levels of its main building, and a new level is created there.
Auto Level (reality capture)
Upload Reality Capture also offers Auto Level. With it on, the Level field disappears and the scan is saved to the ground level of the building you chose (in a project shared with 4.0, the main building).
- If that building has no ground level, Auto Level cannot be turned on.
- When you choose a site, there is no Auto Level: the upload already goes to the site's ground level.
Add to an existing capture, or make a new one
The capture list shows the dates the project already has. Add to an existing capture when the data is part of the same visit, for example a second scan of the same floor on the same day. Make a new capture for a new visit, because capture dates are what you compare over time.