[toc]
On this page
- Four lists, defined once
- Why you cannot pick the thing you need
- Project Types
- BIM Categories
- Work Area Types
- Note Tags
- Renaming and deleting
Four lists, defined once
Team Settings › Standards holds four lists the rest of the product draws on, one per tab:
| Tab | What it defines | Where it is used |
|---|---|---|
| Project Types | Project types and their subtypes, for categorisation | The New Project wizard, a project's Properties |
| BIM Categories | BIM element categories and subcategories, grouped in templates | BIM classification in projects |
| Work Area Types | Types for tagging Work Area Sets across projects | Work Areas - sets, areas and where they apply |
| Note Tags | Tags for Photo & Voice Notes in the CupixCapture mobile app | CupixCapture |
Each list is defined here and chosen elsewhere. This page is the single authority: everywhere a project type is picked reads this list.
Editing this page needs Team Admin (Super Admin included), and the same is true of Templates and Asset Categories. A Project Admin can open Team Settings but cannot edit team standards.
Why you cannot pick the thing you need
If a type, a category or a work area type is not offered where you expect it, it was never defined a level up. The order is always the same:
- Defined at team level, here.
- Chosen per project.
- Used in the work.
A default is a starting point. A constraint is not.
- Defaults seed. Units and language on General give a new project or member a starting point, and they can choose otherwise. Changing a team default reaches back and changes nobody.
- Constraints enforce. A project cannot be given a type nobody defined. Each type's row here shows how many projects already hold it, so the reach of the list is on the page.
Project Types
Add Type, top right, opens a one-field dialog, Create a new project type. Add puts it at the foot of the list with 0 subtypes and 0 Projects. An empty list reads No project types yet.
Expand a type and its last row is an inline field: type a subtype name and press Enter.
The New Project wizard also has Add New beside Project Type and Project Subtype, so a type can be started while creating a project. This page stays the place to review, rename and delete them.
BIM Categories
The same idea one level down. Add Template creates a template; a template expanded ends in + Add category to template. Each template shows its category and subcategory counts and the number of projects using it.
Work Area Types
Add Type creates a type. Each type shows how many Work Area Sets carry it.
Note Tags
Add Tag creates a tag; each tag has edit and delete. A new team starts with Punch List, RFI and Issue. These are the tags people choose from when they record a Photo & Voice Note in CupixCapture. How notes are grouped inside a project is set per project, on Configuration › Note Groups; see Configuration - the project's own settings.
Renaming and deleting
- Renaming a type does not disturb the projects using it: they follow the record, not the string.
- Deleting a project type that is in use is allowed, and the projects survive it. Their Project Type becomes Not set. The confirmation tells you how many projects that will happen to before you agree.
- Deleting a work area type tells you inside the confirmation how many work areas use it, because a count after the fact is not a decision anyone got to make.